Fursy 60 MW

FURSY Solar Energy project development in Ukraine.

This lot includes Ukrainian incorporated SPV along with corporate rights and complete package of documents for land slots designed and registered specifically for solar power plant construction for total output of 69 MW.

Project benefits of implementation in Ukraine:

  • “Green tariff” 11 cents per kW – one of the highest in Europe
  • Tariff «Binding» to EUR
  • SPS placement suited land availability
  • Availability of infrastructure for SPS connection to power grid;
  • Increase in energy prices;
  • Political and state support.

The benefits of the implementation of the project in the selected location (Kyiv region):

  • Good grid connection possibilities
  • Support of the local community